Marine Corps OPS Center
Job Name: Marine Corps OPS Center
Client: GC – Haskell Company
Owner – Naval Facilities Engineering Command Washington
Location: Quantico, VA
Contract Value: $112,000
Completion Date: Fall 2011
Project Scope:
- Lime stabilization on government building site
- Mass fill for roadways, parking lots and building pads
- Keep project on schedule during adverse weather conditions
- Moistures averaged 10% to 25% above optimum
- Note steam rising from soils as Stabilime reacts
- Stabilime cause soil temperatures to rise over 105 degrees
- Crews performed under stringent government safety requirements
Project Summary: 300 tons Stabilime used on job
Special Note: At one point, the contractor was hampered by bad weather conditions which halted his building slab construction. Delmarva started in the morning in the heavily rutted slab area and by afternoon the slab area was dry and workable.